TubeFlow PIC for Production Enhancement
Hydraulics
Models production, injection, and circulation of fluids in the well including effects of heat transfer to/from the formation. In addition, matrix treatment operations such as acidizing and chemical sand consolidation treatments can be modeled
Production System Analysis
Models inflow control device (ICD) flow- estimates ICD pressure loss. Coiled tubing velocity string design can also be performed
Fracturing
Supports conventional and multi-stage fracturing operations. Computes perforation pressure loss, bottomhole treating pressure, and fracture geometry
Overview
Production Enhancement Software Suite
The software suite for production enhancements in TubeFlow PIC is used to model production and injection operations. These operations may or may not include well intervention such as matrix treatments, artificial lift, acidizing, fracturing, well unloading, and production system analysis.
Hydraulics
- models production, injection, and circulation of fluids in the well including effects of heat transfer to/from the formation
- supports a wide spectrum of wellbore fluids ranging from single phase fluids such as air and brines to more complex multiphase fluid system (e.g. foams)
- multiphase flow modeling includes both empirical and mechanistic models
- supports injection of steam and sluries
- designs insulation/packer fluids for deep water environments with flow assurance problems
- supports real-time modeling in injection
Production System Analysis
- designs coiled tubing velocity strings to prevent liquid loading in wells
- aids in fluid determines inflow/outflow well performance using appropriate reservoir and multiphase flow models
- aids in selection of appropriate tubing size
- models inflow control device (ICD) flow- estimates ICD pressure loss
Fracturing
- supports conventional and multi-stage fracturing operations
- calculates pressure loss through restrictions and perforations
- estimates the fracture geometry using 2D fracture models
Torque and Drag
- considers three types of well intervention: coiled tubing, capillary string, and wireline
- evaluates forces and stress on coiled tubing, capillary string, and wireline during well intervention
- determines the buckling status of intervening tubing in the well and identifies lock-up/compression depth
- estimates the fluid drag on tool during well intervention
- calculates the set down weight and overpull while run-in-hole (RIH) or pull-out-of-hole (POOH)
- models extended reach by determining minimum tractor pull requirements
Tubing Movement
- predicts the length and force changes in tubing due to piston, buckling, ballooning, and temperature effects
- determines the maximum triaxial tubing stress and aids in material selection for feild operating conditions
- considers effects of slackoff/pickup in tubing forces calculations
- includes fluid flow and formation heat transfer effects
- determines packer-to-tubing force and designs length of seals required
Well Unloading
- supports both capillary string and coiled tubing
- finds an optimum depth at which the intervening tubing (coiled tubing or capillary string) must be placed for an effective well unloading operation
- determines the minimum pump flow rate (N2 or foam) to unload the well
- estimates the pressures in the well utilizing appropriate multiphase flow models during the unload process
Acidizing
- simulates acidizing operations to aid in pre-job planning
- provides acidizing treatment recommendations
- supports coiled tubing acidizing jobs
- models wormhole penetration depth in carbonate acidizing
Artificial Lift
- models gas lift and pump-assisted lift
- determines the optimum location of gas lift valves and spacing
- aids in jet pump selection and optimizes the power fluid rate along with placement depth
- intervention modes include coiled tubing and jointed pipe
Benefits
- performs a comprehensive engineering pre-job design and post-job analysis
- reduces job design time and cost
- ensures pressure constraints are not exceeded during the job
- optimizes well intervention program and/or pump schedule for a job
Information
A full featured evaluation version is available for 15 days. Please contact us for more information.
Evaluate Now Contact Us