Corporate Products Solutions Services    Downloads Contact Us
Sand Control
    
    
    
    
    
    
    
    
    
    
BTechSoft Engineering Software Consultants
-->

Wellbore Cleanout 
Coiled Tubing Wellbore Cleanout Software

Wellbore Cleanouts are routinely performed in a well as a part of workover operations to clean and service the well. This operation involved removing debris left in the well from a prior job (such as fracturing or milling) by circulating fluid through coiled tubing (CT) and "washing" out the debris to surface.TubeFlow PIC provides the capability to model such coiled tubing wellbore cleanouts (also referred to as fill removal or sand washing) through both steady-state and transient analysis.

A CT cleanout analysis in TubeFlow PIC provides the following features:

  • steady-state or transient analysis  
  • fluid selection through design  
  • comphrensive fluids configuration including non-newtonian and multiphase flow models
  • solid bed heights and settling rates during cleanout operation
  • pressure and temperature profiles
  • volume of wash fluid required and time for cleanout

Design variables include:

  • pump pressure  
  • maximum bottomhole pressure  
  • solid concentration

Information
A full featured evaluation version is available for 15 days. Click here to download the demo. Please contact us at  +1 (832) 295-1521 or   sales [at] BTechSoft [dot] com for more information.